- Area
- 1654 ft2
- Bedrooms
- 5
- Half Baths
- 1
- Full Baths
- 3
- Days For Sale
- 39
Location
- Area:J Myrtle Beach Area--includes Prestwick & Lakewood
- City:Myrtle Beach
- County:Horry
- State:SC
- Subdivision: Ocean Lakes
- Zip code:29575
Amenities
- #Gated-amenities
- #Gated-community
- Balcony
- Bedroom on Main Level
- Breakfast Area
- Breakfast Bar
- Ceiling Fan(s)
- Central
- Central Air
- Deck
- Dishwasher
- Disposal
- Driveway
- Dryer
- Dual Sinks
- Electric
- Furnished
- Gated
- Gated
- Gated Community
- Golf Cart Garage
- Kitchen Island
- Luxury Vinyl
- Luxury VinylPlank
- Main Level Primary
- Microwave
- Patio
- Porch
- RV Access/Parking
- Raised Beach
- Range
- Refrigerator
- Separate Shower
- Sewer Available
- Short Term Rental Allowed
- Solid Surface Counters
- Split Bedrooms
- Stainless Steel Appliances
- Storage
- Vanity
- Washer
- Washer Hookup
- Window Treatments
- Window Treatments
Description
If you've been waiting for an IMMACULATE home on a DOUBLE LOT you found it at MH-203! This 5-bedroom 3.5 bath was built in 2020 and is being sold furnished. Seller spared no expense when building and landscaping this gorgeous property. Going up the covered composite steps brings you to a large covered front deck facing West. Composite decking, composite deck furniture, wood gliders, and a porch swing provide plenty of space to entertain and relax. Inside the entire home has premium LVP flooring, living area has shiplap accent wall and beautiful coastal furniture. Crown molding is found throughout the first floor with chair-rail in the living and dining area. Dining area with large round table flows into the kitchen. Tile backsplash, granite counters, stainless steel appliances, pantry, and island with seating for 4 gives you and your guests plenty of space to eat. 1/2 bath is located off the living room on the way to the primary bedroom with attached full bath. Primary bedroom faces East with a private door to a covered deck providing morning sun and afternoon shade, bathroom has dual sinks, walk-in tiled shower, toilet, and washer/dryer. Upstairs offers 4 more bedrooms and 2 full baths. 2 of the bedrooms have access to the large covered upstairs deck with composite gliders. Bedroom #3 & #4 are on the East side of the house, one has a queen bed and the other has full over twin bunks. Both upstairs baths have granite vanities and tub/shower combos. Crown molding was also installed upstairs to carry the elegance throughout this home. Ground level has a outside shower with hot/cold water and a nice entertaining area with privacy louvers.
What's YOUR Home Worth?
Schools
PK-5 SPED Schools in 29575
SEE THIS PROPERTY
©2026CTMLS,GGMLS,CCMLS& CMLS
The information is provided exclusively for consumers’ personal, non-commercial use, that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing, and that the data is deemed reliable but is not guaranteed accurate by the MLS boards of the SC Realtors.


















