- Area
- 1602 ft2
- Bedrooms
- 3
- Full Baths
- 2
- Days For Sale
- 256
Location
- Area:A Myrtle Beach Area--south of 544 & west of 17 bypass M.I. Horry County
- City:Myrtle Beach
- County:Horry
- State:SC
- Subdivision: Island Green South
- Zip code:29588
Amenities
- #Pool
- #Community-pool
- Attached
- Bedroom on Main Level
- Breakfast Area
- Cable Available
- Central
- Central Air
- Community
- Cooktop
- Dishwasher
- Dryer
- Dual Sinks
- Electric
- Electricity Available
- Garage
- Garage Door Opener
- Internet
- Laminate
- Long Term Rental Allowed
- Main Level Primary
- Microwave
- Other
- Outdoor Pool
- Outside City Limits
- Patio
- Patio Home
- Phone Available
- Pool
- Pool(s)
- Porch
- Range
- Refrigerator
- Security
- Security
- Security Service
- Separate Shower
- Sewer Available
- Solid Surface Counters
- Split Bedrooms
- Stainless Steel Appliances
- Tile
- Trash
- Two Car Garage
- Vaulted Ceiling(s)
- Walk-In Closet(s)
- Washer
- Washer Hookup
- Water Available
Description
This 3BR/2BA home with a 2-car garage is located in the desirable community of Island Green South. This home features one of the larger floorplans with a spacious Family Room (15.5 x 15) and Carolina Room. The kitchen features white cabinets, built-in microwave, flat top stove, stainless steel appliances & solid surface countertops. There is a breakfast nook off of the kitchen. The home also has a formal dining room and laundry room. The master bedroom (15 x 11.9) has a walk-in closet & vaulted ceiling. The master bathroom has a double sink and shower. The extra-large screened in back porch (18.5 x 11) & concrete back patio are the perfect areas to enjoy the privacy of the wooded back yard, which is bordered by a protected nature area. This home has been well cared for by the original owner & received an interior renovation in 2018 which provided for fresh paint, laminate & tile floors throughout. There is minimal traffic as this home is located near the cul-de-sac of a dead-end street. HOA amenities for Island Green South include two community pools, basic cable, internet & trash-pickup. Convenient South Strand Location: close all the attractions & opportunities the Coastal Carolinas has to offer. The natural area behind the home is the Waccamaw National Wildlife Refuge, a wildlife sanctuary covering nearly 55,000 acres of tidal wetlands & forests crossed by rivers.
What's YOUR Home Worth?
Schools
5-6 SPED Schools in 29588
6-8 SPED Schools in 29588
9-12 SPED Schools in 29588
K3-12 Schools in 29588
PK-4 SPED Schools in 29588
PK-5 SPED Schools in 29588
SEE THIS PROPERTY
©2026CTMLS,GGMLS,CCMLS& CMLS
The information is provided exclusively for consumers’ personal, non-commercial use, that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing, and that the data is deemed reliable but is not guaranteed accurate by the MLS boards of the SC Realtors.


















